Cavata Orientale: work continues
Available the new images of the construction site near Carpi
The construction site for the integrated restoration of the Cavata Orientale canal south of Carpi is in full swing.
Thanks also to the favorable weather conditions it has already been possible to realize part of the artefacts for the future expansion area and to start the excavation and re-use of the excavated soil.
The works are constantly monitored from the point of view of noise impacts and dust, even with the aid of a drone supplied to the Consortium.
The excavation deadline is expected by the summer, while in autumn the plantations of shrubs and trees will be carried out.
The works in progress are visible to everyone thanks to a dedicated picture gallery.